When do I need to order everything for my renovation?
Pick your project and your start date. We'll turn real lead times into an order-by date for every item — so nothing puts your project on hold. Free, no sign-up.
13 of 41 items need to be ordered before work starts — and 2 are already past their order-by date for this start date.
Insulation and Drywall
phase starts Oct 30, 2026
- Insulationorder by Oct 16, 2026
- Drywall / drywall repairsorder by Oct 16, 2026
Waterproofing and Framing
phase starts Nov 3, 2026
- Shower pan / linerorder by Oct 20, 2026
- Cement board (shower walls)order by Oct 20, 2026
- Waterproofing membraneorder by Oct 20, 2026
Tile and Flooring
phase starts Nov 6, 2026
- Shower wall tileorder by Oct 7, 2026
- Shower floor tileorder by Oct 7, 2026
- Bathroom floor tileorder by Oct 7, 2026
- Vanity backsplash tileorder by Oct 7, 2026
- Groutorder by Nov 1, 2026
Vanity, Toilet, and Fixtures
phase starts Nov 13, 2026
- Shower enclosure / glass doororder by Aug 15, 2026 · order now
- Tub / bathtuborder by Aug 15, 2026 · order now
- Vanityorder by Sep 14, 2026
- Vanity countertop / vanity toporder by Sep 14, 2026
- Sink(s)order by Oct 30, 2026
- Sink faucet(s)order by Oct 30, 2026
- Medicine cabinet / mirrororder by Oct 30, 2026
- Storage cabinet(s) / shelvesorder by Oct 30, 2026
- Cabinet hardware / pulls / knobsorder by Oct 30, 2026
- Showerheadorder by Oct 30, 2026
- Shower handles / valveorder by Oct 30, 2026
- Shower drainorder by Oct 30, 2026
- Bathtub faucetorder by Oct 30, 2026
- Exhaust / vent fanorder by Oct 30, 2026
- Vanity light fixtureorder by Oct 30, 2026
- Ceiling light fixtureorder by Oct 30, 2026
- Toiletorder by Nov 8, 2026
- Shower curtain rodorder by Nov 8, 2026
- Toilet paper holderorder by Nov 8, 2026
- Towel bar(s)order by Nov 8, 2026
- Robe hooksorder by Nov 8, 2026
- Grab barsorder by Nov 8, 2026
Paint and Finishes
phase starts Nov 18, 2026
- Door hardware / knobs / leversorder by Nov 4, 2026
- Window treatments / blinds / shades / curtainsorder by Nov 4, 2026
- Outlet covers / switch platesorder by Nov 13, 2026
- Shower curtain / rodorder by Nov 13, 2026
- Wall paintorder by Nov 16, 2026
- Ceiling paintorder by Nov 16, 2026
- Door paintorder by Nov 16, 2026
- Trim paintorder by Nov 16, 2026
- Caulk (tub, shower, vanity)order by Nov 16, 2026
Dates change. Your plan should change with them.
Save this plan as a free Hausbound project: check items off as you order, forward order emails to auto-track deliveries, and every order-by date recomputes when your schedule moves.
Save my plan — freeKnow someone else mid-renovation? Send them this plan — it opens the same free tool with these dates already filled in.
Planning a basement, laundry room, home office, or another project? Those templates — with the same order-by engine — are included with Hausbound's unlocked plans.
How this works
Your start date sets when each build phase begins, and every item's order-by date is worked backward from the phase that needs it, using conservative lead times — the full method is in the renovation ordering timeline.
What's different here: these are one-time estimates, but inside Hausbound the same engine recomputes your dates automatically when your schedule moves, your retailer quotes a different lead time, or an order email lands in your Hausbound Mailbox.